Quick Connector SC/APC Optical Connector

                            Quick Connector SC/APC Optical Connector

                            Quick Connector SC/APC Optical Connector

Quick Connector SC/APC Optical Connector

Quick Connector SC/APC Optical Connector,DAYTAI,Electrical Equipment & Supplies,Fiber Optic Equipment
INQUIRY PRECISE INQUIRY
Description

Overview
Quick Details
Place of Origin:
Zhejiang, China (Mainland)
Brand Name:
DAYTAI
Model Number:
SC/APC-High Quality
Connector Type:
SC/APC
Application for:
FTTH Drop Cable.
Temperature Alteration Ratio:
≤0.5dB
Insertion Loss:
≤0.3dB
Return Loss:
≥50dB
Fiber:
2.0*3.0(FTTH Drop Cable)
Temperature:
-40℃+85℃
SC/APC Optical Connector Tension:
20N
SC/APC Optical Connector Packing:
10pcs/card, Blister Packaging
SC/APC Optical Connector MOQ:
100pcs
Packaging & Delivery
Packaging Details
SC/APC Optical Connector:10pcs/card, Blister Packaging
Delivery Time
Shipped in 15 days after payment
Product Feature
Quick Connector SC/APC Optical Connector

* SC/APC Optical Fiber Fast Connector-High Quality
*  Insertion Loss ≤0.3dB
* Return Loss ≥50dB
* SC/APC Type Connector
* Suitable for FTTH Drop Cable.

Analysis Specs
Item
SC/APC-C Optical Fiber Fast Connector
Insertion Loss
≤0.3dB
Return Loss
≥50dB
Fiber
2.0*3.0 (FTTH Drop Cable)
Tension
20N
Temperature Alteration Ratio
≤0.5dB(-40 ℃+85℃)
Temperature
-40℃+85
Operation Tool

* Optical Fiber Cutting
* Covered Wire Stripping Clamp
* Length Fixed Instrument
* Wire Stripper

Operating Dimension
Operation Steps

Note: Following Steps must ensure the cleanliness of product and fiber.


1. Remove the Parts and arrange them in neal row.
2. Penetrate the screw cap through the covered wire cable.
3. Stripe the covered wire, stripped length 50mm.
4. Stripe fiber coating , keep 21mm.
5. Cut out the excess fiber.
6. Fiber length after cut out.
7. Penetrate the fiber, let it a bit bending.
8. Keep fiber bending, and lock the lock catch.
9. Put down tail clip, tighten screw cap, and install the housing.


Re-open

1. Remove the housing ,pull down lock catch.
2. Pull down screw cap, pull out the covered wire, and re-assembly.

Detailed Images
Packing & Delivery